A hyperscale data center can require extraordinary amounts of reliable electric power.
We are tracking grid interconnection, transmission upgrades, substations, electrical demand, redundancy, and who may bear the cost of new infrastructure.
Key Questions We Are Investigating
- ERCOT interconnection status and studies
- Transmission-line upgrades or new builds
- Substation expansions or new substations
- Electrical demand and load forecasts
- Potential impacts to grid reliability
ConfirmedPublicly StatedInferenceUnconfirmed
The representative photograph on this page shows real electrical-substation infrastructure. It does not depict Project Mustang’s final design or confirmed equipment configuration.